Tennis court in Samara
Russia, Samara
task
At the inflatable tennis court facility, there was a problem with metal-halide lamp burning out and its replacement. In addition, the illumination did not reach the standards that allow holding competitions between cities. It was also necessary to save the connection points when replacing the lighting.
solution
Lighting calculations were made and test devices provided. As a result, the proposed luminaires proved efficient as compared to metal-halide lamps. All metal-halide lamps 400 were replaced by Olympic 160. After installation of the new projectors, the lighting became much more comfortable thanks to no glare effect. It was important to the customer that no additional maintenance is required. The customer expressed the gratitude for the completed work.